2.3 Overview of the equipment
Please refer to diagram A3 in Annex A.
Key:
1
2
Cable Glands
3
Pressure Gauges
4
N
Outlet port to buffer (G1") *
2
Pre-treatment dryer power supply
cable gland. (Rating: 115V 1A /
230V 0.5A)
External start / stop circuit cable
gland.
Pre-treatment dryer purge economy
cable gland.
Remote alarm circuit cable gland.
Mains supply cable gland
Column A pressure gauge
Column B pressure gauge
N
Outlet pressure gauge
2
Air inlet pressure gauge
N
inlet port from buffer vessel
2
(G1/2") *
5
6
7
User control interface with 20 x 2 line menu display.
8
Access door
9
Facia
10
11
* Connection available on both sides of the generator.
8
N
Outlet port (G1/2") *
2
Air Inlet port (G1") *
4 – 20mA cable gland
O
Analyser calibration port
2