Herunterladen Diese Seite drucken

Grundfos DMX 221 Installations- Und Bedienungsanleitung Seite 58

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 122
Single-phase VFD variant: connect phase line (L1) to L1, neutral line (N) to L2/N, pro-
tective earth (PE) to PE.
Three-phase VFD variant: connect phase lines (L1, L2, L3) to L1, L2/N and L3, protec-
tive earth (PE) to PE.
L3 L2/N L1 PE
Fig. 11.2.2-2 Mains connection of the VFD
Tighten the screws with 0.5 - 0.6 Nm.
6. Tighten the cable gland.
7. Refit the front cover of the VFD power unit and tighten the screws.
Tighten the screws with 3.5 Nm ± 20 %.
Related information
• 3.1 Preparing the pump for startup
• 11.2.5 Technical data of DMX pumps with VFD
DMX 221 | | 58

Werbung

loading