108
AVENTICS | DeviceNet | R499050019–BDL–001–AD
Commissioning and Operation
Table 14:
Assignment of the S4, S5, and S6 switches
Switches
S4
S5
S6
S6
A
B
Fig. 9:
S4, S5, and S6 switches for assigning valve supply voltages
(U
, U
Q1
This switch allows valves to be assigned in groups to supply
voltages U
and U
Q1
When delivered, all valves are assigned to the U
Subbase positions for double
solenoid valves (solenoids 12, 14)
0
1 – 4
1
5 – 8
2
9 – 12
2
9 – 12
3
13 – 16
When delivered, switches S4 to S6 are in the U
Voltage at switches
Switches can be damaged if voltage is applied during operation.
O
Always operate switches in a voltage-free state!
How to assign the valve supply:
1. Open the lower screw cap B (see Fig. 9 on page 108).
2. Using the S4, S5, and S6 switches, assign each valve group
to one of the supply voltages U
Fig. 9 on page 108).
X71
X72
X10
)
Q2
.
Q2
NOTICE
ON
OF F
S8
U
Q1
U
Q2
S4 S5 S6
voltage.
Q1
Subbase positions for single
solenoid valves (solenoid 14)
1 – 8
09 – 16
17 – 24
17 – 24
25 – 32
Q1
or U
(see Tab. 14 and
Q1
Q2
position.