Commissioning
3.1 Connecting Power
1. Pull the desired length of input power wires through flow meter case conduit cable hole
and into flow meter case before wiring connector.
2. Wire input power connector P8 for AC or DC power depending on power supply provided
as shown below. Insert wires into wire entry holes and secure by tightening wire clamp
screws (see figure below).
Note
Power Supply connector wires should be stripped AWG 12-18 stranded wire or solid
conductors.
Terminal Number
1
2
3
1. Plug input power connector P8 into connector J8 and secure using two captive connector
mounting screws as indicated below.
2. Secure power input cable with cable clamp to prevent wire breakage.
3. Replace Rear Housing Cover and tighten setscrew.
4. Connect the power cables to the appropriate power source previously selected from the
tables above and power up unit (100-250 VAC @ 50/60 Hz or 9-36 VDC).
Note
Loosen Wire Clamp Screw, insert stripped end of wire and then retighten.
Figure 3-1
18
1010X-6SS2
Hot
Neutral
Ground
①
Stripped Wire
②
Connector Mounting Screws
③
Clamp Screws
Input Power Connector (P8) Wiring
1010X-6ZNS2
Positive
Negative (Gnd)
Ground
FUH1010 IP65 NEMA 7 Interface Detector Quick Start
Operating Instructions, 06/2014, A5E02428148-AA
1010X-6ZPS2
Positive
Negative (Gnd)
Ground