TECHNICAL DATA
Power source:
Mains voltage (50Hz-60Hz)
Fuse
Fuse with PFC
Mains current, effective
Mains current, effective with PFC
Power, (100%)
Power, (100%) with PFC
Power, max
Power, max. with PFC
Open circuit power
Efficiency
Power factor
Permitted load:
Duty cycle 40° TIG 100%
Duty cycle 40° TIG 60%
Duty cycle 40° TIG 40%
Duty cycle 40° TIG 35%
Duty cycle 20° TIG 100%
Duty cycle 20° TIG 60%
Open circuit voltage
Current range
1
Application class
2
Protection class (IEC 529)
Standard
Dimensions (hxwxl)
Weight
Water cooling:
Cooling capacity
Tank capacity
Standard
Dimensions (hxwxl)
Weight
Function:
Arc-power
Hot-start
Anti-freeze
Start AMP
Stop AMP
Slope up
Slope down
Gas pre-flow
Gas post-flow
Spot welding time
Pulse time
Pause time
Base Amp
Second current (Bilevel)
TIG-ignition
Triggerfunction
S
1
The machine meets the standards which are demanded of machines
working in areas where there is an increased risk of electric shock
2
Equipment marked IP23 is designed for indoor and outdoor applications
PI 200 DC
PI 250 DC
1 x 230 V ±15%
3x400 V ±15%
-
10 A
16 A
-
-
7.1 A
17.5 A
-
-
4.9 kVA
4.0 kVA
-
9.0 kVA
5.6 kVA
-
35 W
35 W
0.85
0.87
0.90
0.94
150 A
150 A
170 A
190 A
200 A
-
-
250 A
170 A
170 A
200 A
210 A
95 V
95 V
5-200 A
5-250 A
S
S
IP 23
IP 23
EN/IEC60974-1
EN/IEC60974-3
EN/IEC60974-10 (Class A)
360x220x520 mm
360x220x520 mm
22 kg
23 kg
PI 200/250 DC
900 W
2 litres
EN/IEC60974-2
270x220x520 mm
15 kg (incl. 2 l cooling liquid)
Process
PI 200/250 DC
Electrode
0-100 %
Electrode
0-100 %
TIG/Electrode
Always on
TIG
1-200 %
TIG
1-90 %
TIG
0-20 secs
TIG
0-20 secs
TIG
0-10 secs
TIG
0-20 secs
TIG
0-20 secs
TIG/MMA
0.01-10 secs
TIG/MMA
0.01-10 secs
TIG/MMA
10-90 %
TIG
10-200%
TIG
HF / LIFTIG
TIG
2/4-stroke
MAINTENANCE
The machine requires periodical maintenance and
cleaning in order to avoid malfunction and
cancellation of the guarantee.
WARNING !
Only trained and qualified staff members can
carry out maintenance and cleaning. The
machine must be disconnected from the mains
supply (pull out the mains plug!). Thereafter,
wait around 5 minutes before maintenance and
repairing, as all capacitors need to be
discharged due to risk of shock.
Cooling unit
Liquid level and frost protection must be
-
checked and cooling liquid refilled as required.
Drain the cooling liquid out of the cooling module
-
and welding hoses. Remove dirt and flush with
pure water in the tank and cooling hoses. Fill up
with new cooling liquid. The machine is delivered
with a cooling liquid of type propan-2-ol in the
ratio 23% propan-2-ol and 77% demineralized
water, which provides an anti-freeze solution up
to –9°C. (See article number in the spare parts
list).
Power source
Clean the fan blades and the components in the
-
cooling pipe with clean, dry, compressed air as
required.
A trained and qualified staff member must carry
-
out inspection and cleaning at least once a
year.
23