Page 1 Façade
Assemble the ridge plate with the bulges pointing downward, in the bolt slots.
Page 2 Stop Bolts
During the entire assembly !10! stop bolts are placed!!!
Page 3 Sidewall + Stop Bolts
During the entire assembly !2! stop bolts are placed, for greenhouses with 7& 8 windows, there are !3! stop bolts provided. You assemble 2 sidewalls.
Page 4 Assembly
You now have 2 façades and 2 sidewalls. Slide the panels one into the other until the end, the stop bolts are immediately tightened firmly and definitively.
Page 5 Roof
-
First install the ridge (profile C) on top of the 2 façades and fix it definitively with the stop bolts.
-
Greenhouses that are 7 & 8 windows long are provided with 2 glass rods (profile A) of each 2 stop bolts.
-
Place the glass rods (profiles A) between the sidewall and the ridge you just put in place (profile C) .
-
Assemble the traction strips (profiles B) to the ridge (profile C) in the corner and subsequently together with the glass rod (profile A) at the sidewall.
Page 6 Façade Supports
Only for greenhouses of types R3 , R4, S2 & S3.
The two façade supports are assembled between the façade and the ridge.
Page 7 Supports
Only for greenhouses that are 7 & 8 windows long and R4 greenhouses.
Remove 2 glass rods from the sidewall having the same section as the glass rods of the roof in which the stop bolts are inserted. Place two stop bolts per profile. Reinstall
the glass rods, but use an M6x16 bolt at the bottom. Install two gutter supports between the sidewall and the roof with the stop bolts provided. Also install a support in the
ridge of the roof using the stop bolts provided.
Page 8 Preparation of the Glass
Put the construction in its definitive place; upon installation of the glass the construction will be too heavy to move it easily. For a smooth installation of the glass, we put
the construction square and level.
Square by measuring from one corner to the other in both directions and by making both equal.
Level by bringing the 4 corners of the construction at the same level.
Page 9 Glazing
Please work carefully and take all possible precautions for your safety and the safety of the other workers!
Façade:
-
Clear glass is used as standard in the façades.
-
First put in both façades the 2 triangle windows in place under the ridge.
-
Attach rubber as fast as possible!!! For each of the windows!!!
-
Do this for both façades.
It is not important with which rubber roll you start. Do not cut the rubber to lenght on beforehand.
U