7.5 Visual inspection

A visual inspection of the dust extraction system must be carried out quarterly.
Please proceed as follows:
1. A qualified electrician should check all cables for damage.
2. Check the pneumatic connections and hoses for signs of damage or leaks.
3. Check the product for visible damage.
4. Check the pressure regulator (pos. 2) settings. The pressure regulator (pos. 2) is located
behind the panel (pos. 1) anchored to the floor.
Item
1
2
1502649-00
Fig. 38: Adjustment of the compressed air regulator
Tab. 33: Positions on product