12.2
Preparatory activities
12.2.1 Workplace requirements
Select a suitable place for the machine.
Observe the safety requirements of Chapter 11 the dimensions of the machine in section 3.2.
The place chosen must guarantee and the possibility to be connected to a suction system a
suitable connection to the electrical grid.
Make sure that the soil can bear the weight of the machine. The machine must be leveled
horizontally at all bases simultaneously.
You must also secure around a distance of at least 0.8 m around the machine. Upstream and
downstream of the machine must be provided the necessary distance for the supply of long
workpieces.
12.3
Transport / Unloading the machine
For transport of the machine is best suited to a forklift with sufficient carrying capacity.
Lift the machine carefully with the help of the truck and place it on the floor
Check if the belt on the body of the machine is well secured.
The lifting and transportation of the machine may only be carried out by qualified
personnel are carried out with appropriate equipment.
Note that the selected hoisting equipment (crane, forklift, sling etc.) are in good
condition.
Also make sure that the location the weight of the machine can withstand,
especially when you install the machine above the ground floor.
For maneuvering of the machine in the packaging is also a pallet trucks can be used.
12.3.1 Preperation of the surface
Eliminate the preservative, which is applied for corrosion protection of the parts without
painting. This can be done with the usual solvents. Here no nitro solvent or similar means, and
in no case use water.
The use of paint thinners, gasoline, corrosive chemicals or abrasive cleaners will result in
damage to the surface!
Therefore:
When cleaning, use only mild detergent
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
W A R N I N G
N O T E
ASSEMBLY
.
Seite 23
KAM 535