12.4.1 Compressed air connection
The compressed air unit to the compressed air conneciton port.
The pressure setting should be adjusted to about 6 bar.
pressure reducer
compressed air connection
13 OPERATION
Operate the machine only in perfect condition. Before each use, a visual inspection of the
machine must be carried out. Safety devices, electrical cables and controls must be inspected
carefully. Check screw connections for damage and tightness.
13.1
operating instructions
13.2
operation
13.2.1 filling granulat
Open the lid of the pellet container (2) and pour the granules. Then close the granulate container.
13.2.2 Insert edge band in edge band feed
Rest the edge tape on the edges of strip support (12) and carried out by the edge band feed
(14).
13.2.3 switch on the machine
The edge banding machine is turned on with the main switch on the control panel.
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
oiler
Perform all refitting only separation from the mains by!
WARNING
OPERATION
pressure gauge
water seperator
Seite 25
KAM 535