10. Maintenance
See the installation and operating instructions for standard CR,
CRI, CRN pumps.
Pressure intensifier
The pressure intensifier is maintenance-free.
Dosing pump
See the installation and operating instructions for the dosing
pump.
11. Operation
To ensure optimum function and performance, check the pressure
regularly.
Pressure intensifier
The pressure difference between the two pressure gauges (seal
chamber and pump) must be between 1 and 1.5 bar. This
indicates that the seal chamber contains sufficient barrier fluid.
Dosing pump
The pressure of the barrier fluid must always be 1.5 to 2 bar
higher than the pressure of the pumped liquid. This is
automatically checked by the pressure switch/ transmitter fitted
together with the dosing pump.
A very small quantity of the barrier fluid, i.e. less
than 10 ml/24 operating hours, will always flow
Note
into the pumped liquid.
11.1 Frost protection
For general guidelines on frost protection of the pump, see the
installation and operating instructions for standard CR, CRI, CRN
pumps.
Seal chamber
Drain the seal chamber by slackening the lower plug (pos. E,
figures 1, 2, 3 or 4).
Pressure intensifier
Replace the barrier fluid by antifreeze liquid.
Dosing pump
For frost protection, see the installation and operating instructions
for the dosing pump.
Warning
If the pumped liquid is hazardous to health, take
special care when draining the pump. Local
safety regulations must be observed.
12. Disposal
This product or parts of it must be disposed of in an
environmentally sound way:
1. Use the public or private waste collection service.
2. If this is not possible, contact the nearest Grundfos company
or service workshop.
Subject to alterations.
9