Appendix B: Maintenance checklist
Copy the maintenance checklist, fill it in and save it as a service record.
For values, note the value in the result column, otherwise a tick will suffice if the item has
been performed or considered.
WARNING!
Always read section 3. Safety before installation, use, service, or troubleshooting of this
product.
NOTE! If an inspection result (for example, a measured value) differs significantly from a
previous result, find the cause for the difference.
Unit No.
Items to inspect
Dismantle the arm. Clean the whole
arm internally and externally.
Adjust the links.
Check the mounting of the arm on
wall, bench or ceiling.
Check the airflow. If it is reduced, the
ventilation system must be inspected.
After completing maintenance, carry
out and document the earthing and
conductivity tests.
Risk of personal injury.
Date:
Operating hours:
Performed by:
Interval
Accepted level
Annually
Annually
Annually
Annually
Annually
FX
OK
Repaired
Replaced
EX/ESD
EN
2
Part number
19