Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Safety Instructions; Before Installation; Preparatory Work - bürkert 2300 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für 2300:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8.

insTaLLaTiOn

8.1.
safety instructions
Danger!
danger – high pressure in the equipment!
• Before loosening the lines and valves, turn off the pressure and
vent the lines.
Warning!
risk of injury from improper installation!
• Installation may be carried out by authorised technicians only
and with the appropriate tools!
risk of injury from unintentional activation of the system and
an uncontrolled restart!
• Secure system from unintentional activation.
• Following assembly, ensure a controlled restart.
Warning!
for control function i – danger if pilot pressure fails!
For control function I control and resetting occur pneumatically.
If the pressure fails, no defined position is reached.
• To ensure a controlled restart, first pressurize the device with
pilot pressure, then switch on the medium.
22
english
Type 2300
Installation
8.2.
Before installation
• The angle-seat control valve can be installed in any installation
position, preferably with the actuator in upright position.
• Before connecting the valve, ensure the pipelines are flush.
• Make certain the flow direction is correct (Flow direction always
below seat).
8.2.1. preparatory work
Clean pipelines (Sealing material, swarf, etc.).
devices with welded body
Remove the control unit from the actuator (if present):
Clamp the valve body in a holding device.
Loosen the fastening screws (2x).
Remove the control unit upwards.
Fastening screw
(2x)
Fig. 13: Disassembly the control unit
Control unit
Actuator

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis