Herunterladen Inhalt Inhalt Diese Seite drucken

Gas Connection; Steam Connection - Miele Professional WS 5080 Gebrauchsanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation

Gas connection

The gas connection may only be carried out
by a suitably qualified (e.g. Corgi registered)
engineer, in accordance with local and nation-
al safety regulations. The enclosed installa-
tion diagram and the installation instructions
for gas must be followed to ensure correct
gas connection.
The gas group to which the machines have
been set at the factory is given on the Gas
Data sticker affixed to the rear of the machine.
When converting to another gas group, or to
liquid gas, a conversion kit is required,avail-
able from the Spare Parts department, (give
the model and serial number of the machine
as well as the gas type, group and connection
pressure in the country of installation when
ordering). The installation instructions for gas
heated machines must be followed. Conver-
sion may only be carried out by suitable com-
petent persons.
All removable outer housing parts must be re-
fitted after the gas connection has been made.
Do not attempt to undertake any repairs to
gas heated machines yourself. Repairs must
only be carried out by suitably competent per-
sons to ensure safety, e.g. gas engineers
must be registered. Please consult the Miele
Customer Service department or an authori-
zed Service dealer.

Steam connection

Steam connection must only be undertaken
by an authorized installer.
For steam connection it is essential to follow
the Installation Plan and instructions provided.
When connection to steam has been comple-
ted, ensure that all removable outer housing
parts have been put back in place.
60
M.-Nr. 04 506 754

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Professional ws 5100Professional ws 5140

Inhaltsverzeichnis