Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Check-Up - Faema BARCODE Gebrauch Und Installation

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 123
These chapters in the manual are to be used by qualified, authorized technical staff.

5. Installation Check-up

WARNING:
Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING TO THE
INSTRUCTIONS BELOW:
COFFEE CIRCUIT
Keep the coffee circuit wash key (
HOT WATER
Continuously dispense hot water
STEAM (where present)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
MILK CIRCUIT
Keep the milk circuit wash key (
information, please consult the "Cleaning and Maintenance" chapter).
SOLUABLES CIRCUIT (only for machines with solubles)
Keep the coffee circuit wash key (
mation, please consult the "Cleaning and Maintenance" chapter).
Downloaded from
www.Manualslib.com
AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
26)
pressed for a few seconds and follow the steps indicated on the display.
until at least 0.5 liters of water have been dispensed.
28)
pressed for a few seconds and follow the steps indicated on the display (for more
26)
and the milk circuit wash key (28)
manuals search engine
pressed for a few seconds (for more infor-
50

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis