BEZZERA STREGA
MOD.
that the water level in the tank (S version), in the
boiler (R version) is not enough.
Warning:
- A safety device allows to stop the pump after
120 seconds if the water minimum level is not
supplied to the boiler. The machine, as alarm
signal, turns off the safety light (Fig. 01; pos.
12).
5.3 Preparing coffee
1) Remove the filter holder (Fig. 01; pos. 7) from
the supply group.
2) Put the ground coffee into the filter holder,
press it and make attention that the filter hold-
er edge is not dirty with coffee.
3) Replace the filter holder in its housing.
4) Lower the group lever grasping it firmly (Fig.
01; pos. 2) up to the lower run end position
and wait for the release of the first drops of
coffee. Raise the group lever (Fig. 01; pos. 2)
accompanying its movement to obtain coffee
supply.
5) It is not possible to stop the supply, since it is
continuous up to the top end run (the maxi-
mum dose of supplied coffee is ~75 cc);
when the intended dose is reached, remove
the coffee cup.
Caution:
- Operate the lever only if the filter holder is
hooked and loaded with coffee (Fig. 11; pos.
d).
- Do not remove the filter holder loaded with
coffee when the machine is operating.
- Operating the lever group without coffee in
the filter holder causes the sudden, uncon-
trolled return of the group lever to its top end
run position due to the force applied by the
return springs.
- Operate the group lever only if the machine is
on and pressurized.
- Make sure that there is water in the tank, be-
fore operating the group lever (Fig. 11; pos.
e).
- Do not directly touch the metallic area of the
filter holder: danger of burns.
- Operate the group lever taking care not to tilt
and/or overturn the machine (Fig. 11; pos. c).
- The group lever, being subject to water pres-
sure and to the force applied by the return
springs, shall always be accompanied back to
its rest position.
- Do not interfere at all with the normal move-
ment of the group lever and keep your head
and body far from its operating range (Fig. 11;
pos. a - b).
- Do not stay within the operating range of the
group lever.
- Operate the group lever only if it is fully
screwed (cap. 4.4).
- The standard doses for the filters are 8 grams
for one dose and 14 grams for two doses.
5.4 Steam distribution
1) To avoid liquids being sucked into the boiler,
discharge the steam by turning the tap knob
(Fig. 01; pos. 9).
2) Insert the steam nozzle (Fig. 01; pos. 8) in the
container of the liquid to be heated.
3) Press down and hold the steam tap knob (Fig.
01; pos. 9), lifting the lever the tap will remain
in open position (Fig. 06). The amount of steam
distributed is proportional to the opening of the
tap; the more the tap is opened, the more steam
will be distributed.
4) Once steam has been distributed, release knob,
remove liquid container and clean the steam
nozzle immediately with a damp cloth to remove
heated liquid residues.
Warning:
Do not touch the steam nozzle directly as it is hot.
5.5 Drawing hot water
1) Place the water container under the nozzle (Fig.
01; pos. 3).
2) Press down and hold the water tap knob (Fig.
01; pos. 10) to draw the amount of water re-
quired.
3) Once water has been distributed, release the
knob.
Warning:
Do not touch the water distributor tap directly as
28
(Fig. 06)