5.3. PACKAGING
The individual consignments are packed according to the anticipated transport conditions. Without exception
all packaging is made of environmentally friendly material.
The packaging is intended to protect the individual components against transport damage, corrosion and
other damage until they are ready for installation. Do not, therefore, destroy the packaging; only remove it
when assembly is imminent.
NOTE!
•
Risk of environmental harm through incorrect disposal!
•
Packaging materials are valuable raw materials. In many cases they can be re-used or recycled. Incorrect
disposal of packaging materials can harm the environment.
•
Dispose of packaging materials in an environmentally compatible manner.
•
Observe locally applicable disposal regulations. If necessary, commission a specialist disposal fi rm.
5.4. STORAGE
Store the packages in the following conditions:
•
Do not store outdoors
•
Store in a dry and dust-free location
•
Do not expose to aggressive media
•
Protect from sunlight radiation
•
Avoid mechanical jolts
•
Storage temperature: 15 to 35 °C
•
Relative humidity: max. 60 %
•
If storing for longer than 3 months, regularly inspect the general condition of all parts and the packaging.
If necessary re-apply or renew the rust-proofi ng
TIPS AND RECOMMENDATIONS!
•
Some packages may bear labels with storage information that extends beyond these requirements. These
notes should be observed accordingly.
6. INSTALLATION AND INITIAL START-UP
6.1. SAFETY NOTES FOR INSTALLATION AND INITIAL START-UP
STAFF
Installation and initial start-up of the system may only be performed by qualifi ed staff .
6.2. PREPARATION
UNPACKING
•
The system components should be removed from their packaging carefully and prudently.
•
Additional protective packaging should also be removed.
•
Check all components of damages from transport
DEPRESSURIZE
•
Depressurize components and purge with inert gas if necessary
•
Cut tubing with special tool; avoid contaminations (dirt, cuttings, etc.)
•
Check perfect condition of components and purity of connections
6.3. INSTALLATION
Installation and initial commissioning may only be carried out by qualifi ed personnel.
The back plate of the manifold is mounted at the height of 164 cm. The front plate is suspend in the back plate
and secured with the delivered screw below in the middle. Connect grounding on ground plate.
The manifold is mounted with compression fi ttings at process outlet, relief valve, purge inlets and purge
outlets, if existent connect safety and/or check valve.
First remove the plastic caps from all connections.
The piping has to be inserting completely into the compression fi tting.
Than screw the nut hand tight. After that screw with a jaw spanner 1 ¼ turns tight (fi rst installation 1 1/4 turns
for tubes bigger than 1/8 inch and 3/4 turns for 1/8 inch and smaller tubes, retightening 1/4 for all tubes).
19/380
EN