Information
OS.85 and OS.95 and HS.95:
The ECO connection is located on the top side of the compressor housing; a swan neck pipe for protection
against oil migration is therefore not required. Route the line from the connection horizontally or downwards.
Fig. 7: OS.53 .. OS.74 and HS.53 .. HS.74: Pipe layout for economiser / liquid injection
1
Fig. 8: HS.85: ECO suction gas line with shut-off valve, pulsation muffler and screw-in nozzle ①
NOTICE
!
!
Risk of pipe fractures and leakages on compressor and system due to vibrations.
Avoid critical pipe lengths and/or install a muffler.
• Solder the ECO suction gas line directly into the ECO shut-off valve.
• In systems with high refrigerant charge: Install suction accumulator upstream of the suction gas connection of
the compressor.
ST-610-4 // PDF Download
ECO / LI
52