Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - Velleman VTTEST13 Bedienungsanleitung

Kabeltester mit tongenerator
Vorschau ausblenden Andere Handbücher für VTTEST13:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

3.
Operation 
Never connect t
• Testing Continuity 
o Switch to CONT po
Connect the tes
Short‐circuit the
the loop does n
o Switch to TONE po
Connect the tes
Use the receive
the tracker emit
Adjust the receiver se
• Tracking Cables 
o Place the switch to
o Connect the test le
black test lead to t
o Move the receiver 
• Testing a Telephone L
o The transmitter fea
measuring principl
the telephone line
13/04/2010
VTTEST13
the test leads with an active AC 
osition 
st leads to the end of the pair to
e other end of the pair. The CON
ot exceed 10k Ω. 
osition 
st leads to the end of the pair to
r to receive the signal on the ot
ts a beep. 
ensitivity using the sensitivity kn
o the TONE position. 
eads to the pair or connect the r
he ground. 
close to and along the pair to tr
Line 
atures a plug allowing you to te
e is the same provided that you
or DC‐powered line. 
o be tested. 
NT LED will light if the resistance
o be tested. 
her end. Continuity exists when
nob on the side of the receiver. 
red test lead to the pair and the
rack the cable. 
st a telephone connection. The 
u disconnect the connection from
3
rev
v. 01
e of 
 
®
©Velleman
n nv
 

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis