Herunterladen Inhalt Inhalt Diese Seite drucken

Horizont farmer ABN30 Originalbetriebsanleitung Seite 37

Vorschau ausblenden Andere Handbücher für farmer ABN30:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Fig. 7
farmer ABN30 & hotshock ABN 37 for soft soils (5a + 6a for hard soils)
5 + 5a: Included (step-in) U-Spike Ground Stake (combination Ground Rod and support stand).
6 + 6a: Position the energizer so that the optional solar panel faces due south. Rotate optional panel
as shown page 6.
7b:
Attach the included high voltage resistant fence cable 90676U and connecting cable 901502
or others or in the length you need: underground cables 15321, 14040 or 15965.
Soft Soil:
5
Hard Soil:
5a
Insert
U-Spike
into ground.
Optional 1m earth post
8
Fence
farmer ABN30 & hotshock ABN37 & ranger ABN60
Optional Solar Panel
6
Optional Solar Panel
6a
Slide
energizer
onto spike.
Optional Solar Panel
9
Fence
Earth
Optional Solar Panel
7
Fence
Earth
Optional Solar Panel
7a
Fence
Earth
Transport of Energiser
with Solar Panel
Earth
37

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hotshock abn37Ranger abn60108911089210983

Inhaltsverzeichnis