INSTALLATION
•
Connect the cabinet pressure gauge to the compressor per Chapter 11.2.
•
Connect the display in the front door of the cabinet (Fig. 15), and secure the cord to the
display in the clamps (Fig. 16).
Fig. 15: Connecting the display connector
Fig. 16: Position of the clamps in the cabinet
14. COMMISSIONING
•
Check if all fixing elements used during transport have been removed.
•
Check correct connection of compressed air (see chapter 11).
•
Check correct connection to the mains (see chapter 12)
•
Check position of the circuit breaker switch, it must be in position „I". If it is in position „0",
turn the switch (2) to position „I" (Fig. 17)
•
On compressor in the cabinet, switch the switch (5) on the front side of the cabinet to position
„I", the green light indicates the device status in operation. (Fig. 17).