2.1 Warnings
Installation must be carried out by qualified per-
sonnel, according to the instructions supplied by
the manufacturer and in compliance with current
laws.
The machine must be positioned and installed
in a place where use and maintenance are per-
formed exclusively by qualified personnel.
The machine can be used in places set up for staff
kitchen areas in shops, offices and other working
environments; holiday farm houses; by clients in
hotels, motels and other types of accommoda-
tion; bed and breakfast settings; etc.
2.2 Preparation of system for installation
Place the machine on a flat, horizontal, even, dry,
smooth, sturdy, stable surface positioned at such
a height that the cup warming surface is over 150
cm from the ground.
Do not use water jets or install in places where
water jets are used.
To ensure normal operation, the appliance must
be installed in locations where temperatures
range between +5°C and +32°C and humidity
does not exceed 70%.
If the machine is exposed to temperatures below
+0 °C, proceed as follows:
- Ensure that the machine has been in a place
where the temperature is higher than 15°C for
24 hours before turning it on.
The machine is powered by electricity and it needs
the following to operate:
- Connection to mains electricity.
- Connection to mains water.
- Connection to drainage circuit.
2.2.1 Connection to mains electricity
Warnings:
- The connection to mains electricity must be
done by qualified personnel.
- The wiring must be done in compliance with
current laws and earthed.
The machine is supplied with a power cord with-
out a plug; for a permanent electrical connection
between the appliance and the mains electric-
ity, fit a safety omnipolar switch with a minimum
opening between the contacts of overvoltage cat-
egory III, suitably sized for the load and in compli-
ance with the current regulations in force.
2.2.2 Connection to mains water
Make sure that the water supply line is connected
to a drinking water network with operating pres-
sure between 0 and 6 bar (0 - 0.6 MPa).
If the water network has pressures above 6 bar
(0,6 MPa), install a pressure reducer.
Install a water shut-off valve upstream of the ma-
chine's connection.
The water inlet pipe (Fig. 03; pos. 1) has a G
3/8" thread.
Warning: Do not open the screw-on
cap and boiler exhaust valve: risk of
scalding. Use only the new inlet pipe
supplied.
2.2.3 Connection to drainage
circuit
(Fig. 03)
Connect the rubber discharge pipe provided
(Fig. 03; pos. 2) to the G 3/4" connector and
to a pre-installed open or serviceable drainage
siphon.
2.3 Instructions for water softener
Connect the machine as indicated in Figure 4.
For use and maintenance, refer to the instructions
for the water softener
A – Connect to the water inlet pipe
B – Connect to the mains drinking water
2.4 Equipotential connection
This bonding, required by some regulations,
avoids electric potential differences between
earthed devices installed in the same room. This
appliance has a terminal located under the base
to connect an external conductor, with a ring ter-
minal to insert between two nuts with a nominal
section in compliance with current legislation.
38
(Fig. 03)
(Fig. 04)
(Fig. 05)