Herunterladen Inhalt Inhalt Diese Seite drucken

Shutting Down; Commissioning; Appliance Handover; Recommissioning - STIEBEL ELTRON SBP 1000 E Bedienung Und Installation

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION

Shutting down

10.1 Commissioning

Material losses
!
A safety valve is required.
f Fill and vent the appliance.
f Carry out a tightness check.
f Vent the internal indirect coil.
f Switch the mains power ON if required.
f Check the function of the safety assembly.
f Check the function of fitted accessories.
f Then check the function of the solar thermal system, if
appropriate.
f If relevant, check that the DHW temperature displayed on the
heat source control unit is correct.

10.1.1 Appliance handover

f Explain the appliance function to users and familiarise them
with its operation.
f Make users aware of potential dangers, especially the risk of
scalding.
f Hand over these instructions.

10.2 Recommissioning

See chapter "Commissioning".
www.stiebel-eltron.com
11. Shutting down
f If necessary, disconnect any accessories installed from the
mains at the MCB/fuse in the fuse box.
f Drain the appliance. See chapter "Maintenance / Draining the
appliance".

12. Maintenance

No special maintenance is required for the appliance. A regular
visual check is sufficient.

12.1 Draining the appliance

WARNING Burns
Hot water may escape during the draining process.
If the appliance needs to be drained for maintenance or to protect
the whole installation when there is a risk of frost, proceed as
follows:
f For draining the appliance, remove the thermal insulation
around the drain connector.
SBP 1000-1500 E | E SOL | E cool |
21

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sbp 1010 eSbp 1500 eSbp 1000 e solSbp 1500 e solSbp 1000 e coolSbp 1010 e cool ... Alle anzeigen

Inhaltsverzeichnis