Herunterladen Inhalt Inhalt Diese Seite drucken

Main Parts; Installation; Preparation; Checking The Contents - Puqpress Mini Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 44
3.3

Main parts

��
See
for an overview of the main parts of
the Mini.
��
See
for an overview of the main parts of
the Q1.
��
See
for an overview of the main parts of
the Q2.
��
See
for an overview of the main parts of
the Mini/Q1/Q2.
1.  Tamper base bolt
2.  Upper clamp
3.  Tamper base
4.  Contactless sensor
5.  Lower clamp
6.  Lower clamp bolts
7.  Ground coffee basket
8.  Display
9.  Up button
10.  Down button
11.  Set button
12.  On/off switch
13.  Power cable port
14.  Adjustment wheel
15.  Power cable
16.  T-wrench (10 mm)
17.  Allen key (4 mm)
4

INSTALLATION

You have received your PUQpress in
operating condition. Now you only need to 
adjust the port-a-filter and switch on the 
PUQpress. Refer to the chapter 'Safety 
instructions' for more information.
4.1

Preparation

4.1.1 Checking the contents

Check that all parts are present and that no
damage is visible on the parts. If parts are 
missing or damaged, contact your dealer or
your authorised customer service centre.

4.1.2 Tools and materials

Required tools and materials
Port-a-filter (group handle)
Provided tools and materials
T-wrench
4.2 Adjusting the port-a-filter clamp
The PUQpress is designed so that all
different port-a-filters from various 
espresso machines fit into the clamp for 
even and level tamping.
CAUTION
6
Always adjust the lower clamp before use. 
Not doing so results in exposure of
dangerous moving parts.
NOTICE
Make sure to adjust the lower clamp before
use. Not doing so can result in uneven and 
unlevelled tamping.
1.  Slightly loosen the bolts of the lower 
clamp. Use the provided T-wrench. ��
2. 
Mini/Q1: Pull down the lower clamp. ��
Q2:Rotate the adjustment wheel 
13
EN
EN

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Q1Q2

Inhaltsverzeichnis