Herunterladen Inhalt Inhalt Diese Seite drucken

Connection; Connection Overview: Dryexx; Wall Mounting: Dryexx - ECOLAB Lubo-DryExx Advanced Betriebsanleitung

System für die dosierung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.

Connection

6.1
Connection Overview:
fig. 6.1
Pos
Description
1
User connection, R ¾"
2
3/2-Way-Solenoid valve, pre-control valve
3
2/2-Way-Diaphragm valve, pneumatic controled
4
Return connection for hose 12/21
5
Lubricant connection, pressure side.
6
Lubricant connection via suction lance
7
Diaphragm compressed air pump
8
Compressed air connection, applicator pump
9
Compressed air filter regulator
10
Compressed air connection, 8/6
11
3/2-Way-Solenoid valve, control valve pump
6.2
Wall Mounting:
Install the metering station as close as possible to where the lubricant is stored (canister,
CAUTION
barrel, container, tank) to ensure that the suction tubing is as short as possible.
417101634_Lubo-DryExx_Advanced
DryExx
Unit type 182830
®
DryExx
360
Lubo DryExx®
410
®
fig. 6.2
For wall mounting the following parts are supplied:
Pcs.
Description
4
Wood screws, 8 x 60 mm
4
Wall fixing plugs
4
Spacer
4
Disc
Make sure there is adequate access for
maintenance to be carried out!
fig. 6.3
- 39 -
Unit type 182831
Article no.
413110926
417200005
413500313
Rev. 07-01.15
38631302

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis