Herunterladen Inhalt Inhalt Diese Seite drucken

CTC VT 50 Bedienungsanleitung Seite 9

Vorschau ausblenden Andere Handbücher für VT 50:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 34
English
Filling and starting up your buffer tank for the
first time
The first filling and start-up must be performed by a properly qualified person.
Before filling the buffer tank with water, the pipes and the tank must be rinsed to
remove any debris and impurities. Upon start-up, pressure test must be performed
and the sealing of joints must be checked. If the tank will be used in a cooling
system, make sure the water temperature is always above freezing point. To
prevent corrosion in the system, it is recommended to treat the water properly.
Option:
Connecting the electric heating package (for floor-
standing version only)
The buffer tank may be upgraded with electric heating to the designated
connection G1 ½.
The electric heating must be installed by a qualified person.
Maintenance
The exterior of the buffer tank should be cleaned with a soft cloth and mild liquid
detergents. Do not use detergents that contain abrasives. Regular maintenance
interventions include the inspection of the expansion vessel, safety valves and
other valves, although they are not part of the appliance.
WE RESERVE THE RIGHT TO MAKE CHANGES THAT DO NOT AFFECT THE FUNCTIONALITY OF THE APPLIANCE.
9
CTC VT 50 - 300

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis