Herunterladen Inhalt Inhalt Diese Seite drucken

Requirements For Mounting Points; Installing The Instrument - WIKA ACS-10 Betriebsanleitung

Kalibriersystem für gasdichteinstrumentierung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 95
5. Commissioning, operation

5.7.1 Requirements for mounting points

The mounting points must meet the following conditions:
Sealing faces are clean and undamaged.
Sufficient space for a safe electrical installation.
Permissible ambient and medium temperatures remain within the performance limits.
→ For performance limits, see chapter 9 "Specifications"
The measuring instruments must be mounted in the common mounting position per
EN
EN 837-1, with a max. permissible incline of 5° on all sides.

5.7.2 Installing the instrument

The max. torque depends on the mounting point and must be observed
Spanner flats
1. Seal the sealing face (→ see "Sealing variants").
2
Screw in the test item hand-tight in the matching adapter piece of the hose pack.
.
3
Tighten with a torque spanner using the spanner flats.
.
74
Information
The measuring location should preferably be positioned directly at the gas
compartment. The measurement at the end of measuring lines prevents
optimal results (unwanted temperature differences to the main tank).
CAUTION!
Physical injuries caused by components falling down
When connecting the measuring adapter, there is a risk that it could fall
down.
Wear the requisite protective equipment.
Ensure that no persons or sensitive objects can be hit.
(e.g. material and shape). If you have any questions, please contact our
application consultant.
For contact details see chapter 1 "General information" or the back page
of the operating instructions
WIKA Betriebsanleitung Kalibriersystem, Typ ACS-10
Spanner flats

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis