Commissioning
DE
Dimensional drawings (all dimensions in mm [inch]) – Subject to change
EN
FR
IT
ES
RU
NL
DK
SE
FI
PT
GR
PL
CZ
SK
Screw connector
HU
SL
6
Commissioning
RO
Before commissioning, carry out the following checks:
BG
▶
Check whether the mounting and installation have been executed according to
LV
regulations.
▶
Check the device for damage.
LT
▶
Remove any foreign objects.
EE
▶
Check whether all the specified tightening torques have been observed.
CH
KR
7
Operation
CN
The 8082 contact elements are installed in customer-specific systems. The requirements
during operation also depend on the operating conditions and the installation on site.
As an option, the disconnect terminal can be padlocked in the off position according to
IEC/EN 60947-5-1 (using a padlock, item no. 107115).
Function
The contact elements are switching elements in a flameproof enclosure. The contact
elements can be combined to form contact blocks. Using a series 8602/3 actuator, up to four
contact elements can be operated for mounting rail mounting and up to three contact
elements can be operated for front installation.
8
Contact element/disconnect terminal
Series 8082
10 - 10,50
[0,39 - 0,41]
132651 / 8082601300
2021-12-07·BA00·III·en·03
23126E00