3 41 01 261 06 0.book Seite 23 Montag, 16. April 2018 12:03 12
Pipe diame-
Chain
Chain
ter
length
pieces
635 mm
250
710
1
300
870
1
350
1030
1
400
1190
1
450
1344
2
500
1500
2
550
1660
2
600
1809
2
650
1970
3
700
2130
3
750
2290
3
800
2440
3
850
2600
4
900
2760
4
950
2921
4
1000
3079
4
1100
3397
5
1200
3714
5
1300
4032
6
1400
4330
6
1500
4640
7
Order number 3 02 31 034 01 0 (l = 635 mm)
Order number 3 02 31 036 01 0 (l = 63.5 mm)
Order number 3 02 31 035 01 0 (l = 31.7 mm)
Fasten the guide chain to one of both chain pieces on the chain ten-
sioner with the chain bolt and securing ring.
Thread the guide strand of the guide chain through below the two
guide-chain sprockets (Fig. K).
Fasten the free end of the guide chain to the chain tensioner with
the chain bolt and securing ring.
Snug the guide chain against the pipe by turning the hexagon at the
chain tensioner (2).
Align the guide chain with a clearance of 10 mm (bolt of drive chain
to bolt of guide chain) and check 3x around the circumference.
Tension the chain tensioner via the hexagon (29) until the washer
(30) faces against the housing of the chain tensioner (tensioning
range approx. 50 mm). (Max. tightening torque 50 Nm)
Caution! Danger of accidents!
!
Do not turn or screw the three securing screws
(31) on the face side. (see figure K)
Final work after completing each job.
Retract the cutting tool
Switch off the pipe milling machine
Remove the cutting tool
Unclamp the pipe milling machine.
For pneumatic machines:
After uncoupling the compressed-air hose, pour a little corro-
sion-preventing oil into the air supply of the pneumatic motor
and run it for a short time.
Close the hose opening with a protective cap.
Storing the pipe milling machine.
Protect the outer metallic parts against corrosion.
Store the pipe milling machine in a dry place.

Maintenance and repairs.

Chain length of guide
chain
Maintenance and repairs.
Chain
Chain
We recommend our customer service department (central repair).
pieces
pieces
Address at the end of this instruction manual.
63.5 mm
31.7 mm
Only use original FEIN spare parts.
1
1
!
4
0
by switching ON unintentionallyn.
6
1
Before commencing any work on the pipe milling machine, disconnect
8
1
the mains plug or the compressed-air hose!
1
1

General information

4
0
Servicing work may only be carried out by qualified engineers.
6
1
Care and maintenance work mainly comprises the following:
8
1
- Cleaning the outside of the pipe milling machine and the clam-
1
1
4
0
- Visual check of the entire pipe milling machine
6
1
- Changing the gear oil
8
1
- Filling the compressed-air maintenance unit with lubricant
1
1
- Greasing the movement thread and chains
4
0
- Greasing the guides of the tool spindle holder in the clamping
6
0
8
1
- Renew the stickers and warning indications on the machine.
3
1
8
1
Care of the link chains
3
1
After removing most of the dirt on the chain with benzine used for
8
1
cleaning, petroleum or similar agent, clean it carefully moving the
chain links.
3
1
For guaranteeing sufficient lubrication, leave the chains in viscous
oil, e. g. gear oil SAE 140 for several hours.
!
Before using the chain parts again, make a thorough visual check of the
chain links and ensure that they are in perfect condition. Change any da-
maged parts and replace any missing securing rings.
Tool spindle holder
Checking the gear-oil level
Check the oil level and tightness of the tool spindle holder each
time before using:
Please note:
The oil level is correct if a little gear oil is still just seeping from the
tapped hole.
Changing the gear oil
The gear oil is to be changed according to the number of operating
hours given in the table, however, at least ever 18 months.
Gear-oil change intervals
[operating hours]
First oil change after
Next oil change after
Our central repairs department carries out the oil change for you
and disposes of the used oil.
Drain the gear oil in its warm operating condition immediately after
storing the pipe milling machine.
Risk of injury
ping chain
and transport device.
Danger of accidents!
Check the gear-oil level
If necessary, change the gear oil.
See also the section on "Lubricants and lubrication plan".
Place the pipe milling machine with the side plate opposite the
tool protection lying on a horizontal base.
Remove the screw plug (25, Fig. A).
If necessary, top up with gear oil (see the section on "Lubricants
and lubrication plan").
Screw on the screw plug again tightly.
RSG Ex 1500 A
(**)
RSG 1500 A (**)
RDG 1500 A (**)
20 – 40
80 - 120
en
23
RSG Ex 1500 B
(**)
RSG 1500 B (**)
RDG 1500 B (**)
80 - 120
200 - 250