Herunterladen Inhalt Inhalt Diese Seite drucken

Technical Data; Function Of The Unit; Overview (A); Start Of Operation - Rothenberger RODIACUT 400 PRO Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für RODIACUT 400 PRO:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
Do not leave any tools inserted during the installation of the drill rig/drill motor.
Use your personal protective equipment: safety shoes, protective gloves, ear protectors, dust
mask.
Wear close-fitting clothing, remove jewellery and tie back or cover long hair.
The 90 dB noise level is exceeded during drilling. It is, therefore, mandatory to wear suitable ear
protection. Non-observance can lead to significant hearing damage.
The operator must observe the drilling equipment attentively during drilling. Shut down the motor
immediately at the first sign of any disturbances (e.g. cooling water deficiency, loosening of the
drill rig, core bit blocked etc.). Drilling work must only be continued after the cause has been
remedied.
Core hole drilling in ceilings with rooms underneath constitutes a high safety risk. After drilling
through the ceiling there is the danger of the drilling cores crashing down. Suitable counter-
measures must be taken (e,g. safeguard or close off areas, remove drilling cores in an upward
direction): SAFEGUARD THE BUILDING SITE.
2

Technical Data

Dimensions (LxWxH) .................................. 460 x 305 x 1150 mm
Drill stroke max ........................................... 680 mm
Drill diameter max ....................................... ø 400mm (optional ø 500mm)
Sloping support ........................................... yes
Weight ca. .................................................. 28 kg
Dowel depth extent ..................................... 350 mm
3

Function of the Unit

3.1
Overview
Base plate
1
Drill column
2
feed unit
3
Advance lever
4
Hexagon nut
5
Eye bolts
6
As the system consists of coordinated components, please only use original ROTHENBERGER
spare parts, accessories and diamond drill bits in order to enable optimum efficiency of the
equipment at all times.
3.2

Start of operation

Positioning:
Please pay attention to the position of the ring bolts (6)! Ring bolts must not overlap the
lower edge of the base plate!
 Measure borehole and mark the centre. See technical data for extent of dowel depth!
 Adjust and fasten base plate (1).
The respective optimum fastening possibility depends on the building site conditions (see fas-
tening possibilities, item 3.3).
You can achieve the final fine alignment or adjustment of the drill rig by tightening the four ring
bolts (6).
Every time before start of operation make sure that the drill rig is firmly fastened and
not able to shake!
12
Fine feed 1:3
7
Hand grip
8
Strut head (optional)
9
Magnetic depth stop
10
Feeder locking device
11
Rocking clamp lever
12
ENGLISH
(A)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis