Before operation
Connecting the torch
8
58
Fig. 5:
Connecting the torch
 Connect the torch 58 to the socket 8 and secure it by
turning it to the right.
09.16
Connecting the inert gas cylinder
61
60
Fig. 6:
Connecting the inert gas cylinder
 Secure the shielding gas cylinder 60,e.g. by using a
securing chain.
 Briefly open the gas cylinder valve 61 several times in
order to blow out any dirt particles present.
 Connect the pressure reducer 64 to the shielding gas
cylinder 60.
 Screw the shielding gas hose 65 onto the pressure
reducer 64 and open the shielding gas cylinder 61.
 Open the valve 56 at the TIG torch.
9 Shielding gas flows.
 Set the gas quantity with the setting screw 66 of the
pressure reducer.
9 The gas quantity is indicated on the flow meter 63.
Rule of thumb:
Gas nozzle size = litres/min.
The cylinder content is indicated on the content ma-
nometer 62.
909.2779.9-00
62
63
64
66
65
- 25 -