Herunterladen Inhalt Inhalt Diese Seite drucken

Operation Liquid Dosing; Installing And Removing The Liquid Dosing Head; Adjusting The Dosing Height - Mettler Toledo QLX3 Benutzerhandbuch

Flüssigdosiermodul für xpr-analysenwaagen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 31
5 Operation
5.1 Liquid dosing
For further information, consult the Reference Manual (RM) of your XPR balance.

5.1.1 Installing and removing the liquid dosing head

Installing the dosing head
1 Slide the dosing head (1) onto the dosing head holder
(2) until it comes to a stop.
2 Slightly press down the dosing head until it properly sits
in the dosing head holder (2).
The dosing head is locked in the holder.
3 Thread the liquid tube through the slot in the top door.
The dosing head is ready to dose.
Removing the dosing head
1 Press the release button (1) on either side of the dosing
head holder to release the dosing head (2).
2 Simultaneously, pull the dosing head (2) up and
outwards.

5.1.2 Adjusting the dosing height

The vertical position of the liquid module is adjusted by moving it manually up and down along its rails.
16
u
www.mt.com/XPR-analytical-RM
1
2
QLX3 liquid module
2
1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis