17
Technical Information
Heater Band Installation
Switch on the heater while the turbopump is in operation. In the
event of turbopump overheat, the pump will be automatically cut out
by the thermistor sensor.
The turbopump must be "baked" only when operating with an inlet pressure
NOTE
less than 10-4 mbar and with water cooling.
If the chamber of the system is "baked" at a high temperature, a shield should
CAUTION!
be installed to pre-vent thermal radiation heating the high vacuum flange on the
pump. The maximum temperature allowed for the inlet flange is 120 °C.
206/228
All manuals and user guides at all-guides.com
Turbo-V 81-M User Manual / 87-900-983-01 (E)