Herunterladen Inhalt Inhalt Diese Seite drucken

Spelsberg Rapid-Box HT Montageanleitung Seite 22

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation instructions
Note:
If the terminal is used as a connecting terminal, the
two cable ends must be arranged under a clamping
point.
Before the cable is finally inserted, the seal must be prepared. This is done by moistening the conical area
of the four sealing shells with the separately available assembly agent POWERSIL
(article no. 492 590 01) . This procedure must be repeated each time the container is resealed.
Enclosure
Now the line can be inserted. The clamp's sheath nuts
are screwed on and tightened with the torque specified
for the size of nut used.
Terminal size
16 mm²
50 mm²
ASSEMBLY
22
Torque
6 Nm
10 Nm
Cover
Paste AP
®

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

302 321 16302 321 50302 442 16302 442 50

Inhaltsverzeichnis