Herunterladen Inhalt Inhalt Diese Seite drucken

A - Dismounting Of Panel With Coil; C - Dismounting Of The Control Panel; D - Dismounting The Heat Exchanger; Filling The System - Olimpia splendid Bi2 Air TR Hinweise Für Die Verwendung Und Pflege

Gebläsekonvektoren
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 109
2.8.a - Dismounting of panel with coil (fig.12-13)
a. Remove the air filters (19) on the lower side;
b. Undo the fixing screw of the front panel (9) and dismount it by removing it from the lower hook;
c. Remove the upper insulating material of the battery (22);
d. Unscrew the upper inlet connector (23)
e. Unscrew the lower outlet connector (24);
f. Extract the panel with coil (25).
2.8.b - Dismounting of the radiant panel (only for SLR) (fig.14)
a. Dismount all the collector units (26).
2.8.c - Dismounting of the control panel (fig.15)
a. Dismount the control panel (26) by undoing the two fixing screws (26a).
b. Disconnect the connectors of the electrical connections.
c. Remove the wiring inside the machine and reinsert them on the opposite side.
d. Use, for the motor, display flap motor connection, the specific wiring for right connections, available
as an accessory.
e. Dismount the condensation collection basin (7) and remount it on the opposite side with the corre-
sponding fixing screws (7a).
2.8.d - Dismounting the heat exchanger (fig.16-17)
a. Undo the four screws (27a) which secure the lower heat exchanger;
b. Remove the heat exchanger (27);
c. Remove the drip edge extension (17) from the central basing (for SLR/SL 200-400-600-800-1000
models);
d. On the opposite side, remove the cap (17a) on the condensation discharge hole;
e. Undo the fixing screw (27b) of the central condensation collection basin, move the basin on the oppo-
site side so as that the connection for the drip edge extension protrudes from the structure and then
lock the basin with the previously dismounted screw (27b) (only for SLR/SL 200-400-600-800-1000
models);
f. Reinsert the drip edge extension (17) (for SLR/SL 200-400-600-800-1000 models) and the cap (17a)
on the opposite side (for SLR/SL 1400-1600 models);
g. Open the precut hexagonal holes on the right lateral insulation and close the left shoulder hexagonal
holes with insulating material;
h. Rotate the heat exchanger (27) by bringing the connections on the opposite side and reinsert it on the machine;
i. Tighten all the fixing screws (27a) of the lower heat exchanger.
Once all the described operations have been completed, remount all the previously dismounted
components following the dismounting operations in reverse order.

2.9 - FILLING THE SYSTEM

During start-up of the system, make sure that the holder on the water system is open. In the case of absence
of power supply and the thermal valve has already been powered previously, it will be necessary to use the
specific hood to press the valve disc to open it.

2.10 - AIR EVACUATION DURING FILLING OF THE SYSTEM

a. Open all the interception devices of the system (manual or automatic);
b. Start filling by slowly opening the system water loading valve;
EN - 12

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

B0872

Inhaltsverzeichnis