Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance - GYS POWERDUCTION 110LG Handbuch

Vorschau ausblenden Andere Handbücher für POWERDUCTION 110LG:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 36
Translation of the original instructions
POWERDUCTION 110LG / 160LG / 220LG
Risk of metal or adhesive projections
• Wear approved protective goggles with lateral protections, or
protect the whole face with a screen.
• Wear protective clothes.
• Wear gloves.
Do not obstruct the machine's air intake, which facilitates air circula-
tion. Check the installation chapter before using the device.
Connection:
• This machine must be connected to an earthed socket.
• These Class A devices are not intended to be used on a residential
site where the electric current is supplied by the public network,
with a low voltage power supply. There may be potential diffi-cul-
ties in ensuring electromagnetic compatibility on these sites, be-
cause of the interferences, as well as radio frequencies.
• This product does not comply with IEC 61000-3-12 and is intend-
ed to be connected to private low voltage networks which are
connected to public supply network only at the medium and high
voltage level. If connected to a public low-voltage supply network,
it is the responsibility of the installer or user of the equipment to
ensure, by consulting the operator of the electrical distribution net-
work, that the hardware can be connected.
•This equipment complies with the IEC 61000-3-11.

Maintenance:

• If the power cable is damaged, it must be replaced by the manu-
facturer, its after sales service or an equally qualified person to
prevent danger.
• Warning! Always disconnect from the mains before performing
maintenance on the device.
High Voltage and Currents inside the machine.
• If the internal fuse is melted, it must be replaced by the manufac-
turer (GYS' dedicated sales service) or by an equally qualified
person to prevent any accidents.
• Remove the casing on a regular basis, to remove any excess dust.
Take this opportunity to have the electrical connections checked
by a qualified person, with an insulated tool.
• Do not use solvents or any agressive cleaning products.
• Clean the device's surfaces with a dry cloth.
Regulations:
• Device complies with europeans directives.
• The certificate of compliance is available on our website.
• EAC Conformity marking (Eurasian Economic Community).
• Equipment in compliance with British requirements. The British De-
claration of Conformity is available on our website (see home page).
• Equipment in conformity with Moroccan standards.
• The declaration C‫( م‬CMIM) of conformity is available on our web-
site (see cover page).
EN
25

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Powerduction 160lgPowerduction 220lg

Inhaltsverzeichnis