5. TRANSPORT AND INSTALLATION
5.1. Introduction
IMPORTANT!
Lifting and handling operations must be carried out exclusively by specialized and trained personnel
who can carry out these activities.
During installation, OEM ALI GROUP S.R.L A SOCIO UNICO technicians must be supported by operators prepared
for future maintenance and use of the machine.
The machine is designed so that in the packaging, transport and assembly phases it is necessary to use a forklift or a
crane / hoist.
5.2. Packaging
The machine is shipped by OEM ALI GROUP S.R.L A SOCIO UNICO from the factory to the customer.
Depending on the distance of the transport, the customer's specific requests and the residence time of the load in
the packaging, the machine is shipped in the following ways:
normal protective packaging for short and medium distances;
•
special protective packaging for long distances.
•
The shipment must be carried out with covered or sheeted means depending on the type of load.
When receiving the machine, the customer must check that there is no damage caused by the transporter or
personnel in charge of specific operations.
If there are damages, leave the packaging in question in the found state and immediately request the
•
damage assessment by the relevant shipping company, then communicate with a certificate of failure the
damage detected to the competent transport insurance and to the point of sale.
•
If the oven is in wooden box, on pallets or on wooden brackets with possible heat-retractable cellophane
•
protection, initially remove the packaging or any cover. To completely free the machine, remove the screws
and metal strapping. Then lift the machine with a lifter trolley as described in the appropriate table and
remove the pallet used for transport.
CHAPTER 5– TRANSPORT AND INSTALLATION
PIZZA OVEN mod. TL
Page 117