Ensure that all devices, equipment and also hands and work wear are
kept clean and free from oil and grease.
VISUAL CHECK BEFORE INSTALLATION
•
Check that all components in the package (including labels) are not
damaged. If they are damaged, withdraw them from service and label.
•
Visually check if the product is clean, if needed follow the procedure for
cleaning that is described in this instruction for use.
EN
Note: Follow the local standards and project documentation during the
installation. For installation of TU GCE recommends to keep the follow-
ing procedure:
•
Keep order of gases from left to right
or from top to bottom as follows: O2;
N2O; O2/N2O; AIR; AIR-800; CO2; VAC; others
•
Recommended distance between every installed TU:
SPECIAL TOOL SET (MP_00345) REQUIRED FOR QUICK COUPLER IN-
STALLATION
SPANNER:
Used for keeping the QC in position
PIPE WRENCH:
Used for tightening the QC
6/152