nextec™ — Predicts. Protects. Performs.
Tank Installation (cont'd)
Materials:
• 1-1/4" steel pipe cut to a length at least 3" above of the bottom of the tank when screwed into the tank adapter, with the tank adapter
screwed into the bung conection on top of the tank.
• Thread pipe joint sealant appropriate for the application.
Pump
Inlet Flange
Gasket
Screen
Tank Adapter
Suction Tube
Tank Bung Connection
1. Thread the 1-1/4" pipe into the tank adapter. Seal threads liquid tight with appropriate sealant. (Figure 1)
2. Screw the tank adapter (with suction pipe) into the tank bung; seal threads liquid tight with appropriate thread sealant (Figure 2).
Mount the pump on the tank adapter; making sure the seal and screen are installed as shown. (Figure 2).
3. Mount the pump on the adapter; making sure the seal and screen are installed as shown. (Figure 3).
Figure 1
Figure 2
NOTE: Tank adapters come in either
NPT or BSPP threads, depending on
the model you purchase:
NX3204
NPT
NX3204F
NPT
NX3205E
BSPT
NX3205FE
BSPT
NX3210B
NPT
NX3210FB
NPT
Figure 3
IMPORTANT! Be certain the screen is properly seated in the indentation in the tank adapter before installing seal and tank
adapter to the pump. Failure to properly seat the screen can result in fluid leakage.
Nozzle Boot Installation
Install the nozzle boot using the supplied attaching bolt. Note that the
bolt is inserted through the hole closest to the nozzle opening, and
the boot is then positioned so the peg on the pump mounting surface
inserts in the top second hole of the boot. This allows for correct
alignment of the nozzle when inserted into the boot.
Pump Foot Installation
The mounting foot is bolted to the bottom of the
pump using the four supplied socket head cap
screws. Mount the foot with the bolt flanges
inboard of the mounts on the pump as illustrated.
Torque to 50 in lb. with 4 mm hex key.
7
Mounting peg
Mounting bolt