Installation
Once the appliance is installed in its final position, let it rest for at least 12 hours
before plugging it into the power supply.
The dimensions of the cabinet must correspond to those of the refrigerator.
1.
Attach the mounting bracket to the bottom of the refrigerator.
25
V.1.0
installation