Operating Instructions - Heramat C
7.4.6
Programming mode
The programming mode serves for entering, checking and altering the data of the program
parameters. When you press the "STEP" key, you automatically go to the parameter field, where
data can be entered. Press the "PROG" key to leave the parameter field.
7.4.7
Entering and altering parameter data
Press the "STEP" keys to go to the desired parameter, and you can read off the value in the data
display.
Use the data keys to enter the necessary parameter data. With this procedure, you can move
through your parameters and check and alter data as required.
Press the "ENTER" or "STEP" key when you have completed entering or altering the required
parameters.
Example 1: Entering a START TEMP of 650°C:
1. Press the "STEP" key until the "START" LED lights up.
2. Press the keys "6", "5", "0".
3. Press the "ENTER" or "STEP" key again if you wish to enter other parameter data.
Example 2: Entering a VACUUM HOLD period of 1 min. 35 s.
1. Press the arrow key until the "HOLD" LED lights up.
2. Press the keys "1", "3", "5".
3. Press the "ENTER" or "STEP" key again.
NOTE!:
The (Minutes : Seconds) display stops flashing after confirmation. (If a Vacuum
Hold period is entered, the V Off value disappears).
7.4.8
Description of parameters and their limit ranges
Parameter
START
DRY
PRE HEAT
GB 46
Function
The start temperature of the
program. The combustion
process begins as soon as it is
reached.
The time in which the lift
platform moves out of the lowest
position until the muffles are
closed.
The final stage of DRY, during
which the muffle is closed and
the temperature does not rise
for the specified period.
Heraeus Kulzer GmbH • Grüner Weg 11 • D - 63450 Hanau
Range
Remarks
300°C to 800°C
One of the parameters that must
be entered to run the program.
0 to 30 minutes
While DRY is displayed, the lift
platform moves up in five steps.
The original programs 4, 16,
18+29 (paste-opaque) use a
waiting period of 4 minutes in
lowest lift position, in addition to
the Dry time. The customer
programs 95-98 also use this
waiting period of 4 minutes in
addition to the freely
programmable Dry time.
0 to 30 minutes
The vacuum pump starts up only
after the PRE-HEAT period has
expired.