Herunterladen Inhalt Inhalt Diese Seite drucken

Use; Operating Procedures; Powering On The Controller; Starting The Pump - Agilent Technologies TwisTorr 74 FS PCB 24 Bedienungshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 23

Use

This section provides all the major operating procedures. For further
details and for the procedures that involve connections or specific
options, refer to the section entitled "USE" in the Appendix
"Technical Information".
Perform all electrical and pneumatic connections before using the
controller, with reference to the manual of the connected pump.
WARNING!
Refer to the relevant pump manual to operate it in a safe way before starting.

Operating Procedures

Powering on the Controller

To power on the controller, simply provide electrical power to it.

Starting the Pump

To start the pump, leave pin 12 of connector J4 open so that the
pump starts-up when 24 Vdc is provided to the controller.

Stopping the Pump

To stop the pump, short-circuit pins 12 and 15 of connector J4.
TwisTorr 74 FS PCB 24 Vdc Controller User Manual / 87-901-056-01
Instructions for Use

Use

169/209
16

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis