Herunterladen Inhalt Inhalt Diese Seite drucken

Taping The Tubes; Finishing The Installation - Technibel KPAFP125R5IA Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21

5-4. Taping the Tubes

(1) At this time, the refrigerant tubes (and electrical
wiring if local codes permit) should be taped
together with armoring tape in 1 bundle. To pre-
vent the condensation from overflowing the drain
pan, keep the drain hose separate from the
refrigerant tubing.
(2) Wrap the armoring tape from the bottom of the
outdoor unit to the top of the tubing where it
enters the wall. As you wrap the tubing, overlap
half of each previous tape turn.
(3) Clamp the tubing bundle to the wall, using 1
clamp approx. each meter. (Fig. 5-10)
NOTE
Do not wind the armoring tape too tightly since this
will decrease the heat insulation effect. Also ensure
that the condensation drain hose splits away from the
bundle and drips clear of the unit and the tubing.

5-5. Finishing the Installation

After finishing insulating and taping over the tubing,
use sealing putty to seal off the hole in the wall to pre-
vent rain and draft from entering. (Fig. 5-11)
Apply putty here
15
Clamp
Insulated tubes Drain hose
Fig. 5-10
Tubing
Fig. 5-11

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kpafp165r5iaKpafp185r5ia

Inhaltsverzeichnis