GB
the danger of serious or fatal
injuries, we recommend that
individuals who wear medi-
cal implants should consult
their doctor and the manu-
facturer of the implant be-
fore operating the machine.
Assembling instructions
Prior to any work on the implement
always disconnect the plug from
the power socket!
Ensure during assembly that the
power cable is not squeezed and
that it has sufficient play.
Assembling the handle
B
bar
1. Attach the lower bar (6) to the ap-
pliance housing (8) and fasten it
using the two quick-release levers
and washers (7). The smooth side of
the washer should point towards the
quick-release lever; the grooved side
should point towards the device.
2. Screw both central bars (5) with the
screws, quick-release levers and
washers (4) to the lower bar (6). The
smooth side of the washer should
point towards the quick-release lever;
the grooved side should point towards
the device.
3. Suspend the mains cable strain relief
(14) from the upper handlebar (3).
4. Screw the upper handlebar (3) with
the screws, quick-release levers and
washers (4) to both central bars (5) to
fasten.
5. Fasten the machine cable (15) to the
bar using the machine cable terminals
(11).
28
C
Mounting and emptying
the collection bag
WARNING: Never operate the
implement without the impact
protector. Danger of Injury!
The collection bag is only intended
for operation with the aerator cylin-
der (
16).
A
1. Pull the collection bag over the rods.
2. Put the plastic straps of the collection
bag over the collection bag rods and
clip into the plastic straps.
Mounting the collection bag on the im-
plement:
3. Lift the impact protector (13).
4. Push the pins on the collection bag
rods into the socket in the implement
case.
5. Release the impact protector so that
it holds the collection bag (12) in its
position.
Removing and emptying the collection
bag:
6. Lift the impact protector (13) and take
out the collection bag (12).
Operation
Please observe local regulations
concerning noise protection.
Setting the working positions
The implement has 5 principal position
settings:
+10 mm:
Transport position
This position sets the maximum safety
spacing between the tool and the floor.