Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Preliminary Checks - CAME F500 Installationsanleitung

Vorschau ausblenden Andere Handbücher für F500:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 38

5 Installation

Installation must be carried out by expert qualified personnel and in full compliance with current regulations.

5.1 Preliminary checks

Before installing, do the following:
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage;
• Fit tubing to drain away any water leaks which may cause oxidation;
Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra insulation
as compared to the other conductive parts inside;
• Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving parts;
• Make sure there is a mechanical stop for opening and closing.
F500
i
= 230 mm max
with 90° opening angle
B= 210 mm
A= 40 mm min
F510
B= 350 mm
A
Excentration minimum
B= 235 mm
A= 100 mm max
GATE WING WIDTH
m.
0,80
1,20
1,60
A
40÷100
C min= 0 mm
B= 210 mm
Excentration maximum
C max= 150 mm
GATE WING WEIGHT
Kg.
150
125
100
C
0÷150
B= 235 mm

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

F510

Inhaltsverzeichnis