Herunterladen Inhalt Inhalt Diese Seite drucken

Transport And Storage; Product Selection, Project Engineering And Modification - Stahl 8118/1 Serie Betriebsanleitung

Klemmenkästen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Transport and Storage

EN
4
Transport and Storage
EN
 Transport and store the device carefully and in accordance with the safety notes
EN
(see Chapter "Safety").
EN
EN
5

Product Selection, Project Engineering and Modification

EN
DANGER! Explosion if the entire device is completely painted after manufacture!
EN
Non-compliance may result in serious or even fatal injuries.
EN
 Do not paint the device.
 Have all repairs performed by the manufacturer.
EN
EN
DANGER! Explosion due to defective sealing of the device!
Non-compliance may result in serious or even fatal injuries.
EN
 Do not create any additional drilled holes to apply labels or plates (on the outside).
EN
 Equip the enclosure only with suitable equipment (e.g. cable entries,
EN
EN
EN
 Observe the operating instructions from the manufacturers of the components and
EN
 Seal any unused cable entries with the stopping plugs approved for the type of
EN
EN
 Seal all open drilled holes by means of suitable equipment.
EN
EN
When complying with the installation conditions and specifications on the rating plate:
 Check whether enough cable entries are provided. Create additional drilled holes if
EN
necessary, see Chapter 5.1.
EN
 Equip terminals and, if necessary, mount built-in components;
see Chapter 5.3.
EN
EN
The primary methods considered for modification are remachining or retrofitting equipment
EN
to the control and distribution boxes. The following options are available for this:
• Additional drilled holes in the enclosure either by R. STAHL (Chapter 5.1.1)
or by the customer (Chapter 5.1.2.1)
• External add-on components either by R. STAHL or by the customer (Chapter 5.2)
• Internal built-in components either by R. STAHL or by the customer (Chapter 5.3)
NOTICE!
Non-compliance can result in material damage.
 Acceptance testing for work you performed must be carried out in accordance with
national regulations. Otherwise, you must have R. STAHL or a test body
(third-party inspection) (Chapter 3.3.1) carry out acceptance testing.
This can be done by R. STAHL on request based with a corresponding quotation.
If the work is carried out by R. STAHL, no additional acceptance is necessary.
8
Terminal Boxes
Series 8118/1, Series 8118/2
stopping plugs, drain valves or breathers) that is verifiably approved for use in
hazardous areas and meets the requirements of the IP protection
(for approved Ex-Zone and IP, see rating plate).
seals that are to be installed.
protection.
133285 / 8118609300
2019-11-13·BA00·III·en·06

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

8118/2 serie

Inhaltsverzeichnis