Herunterladen Inhalt Inhalt Diese Seite drucken

General Assembly Requirements; Assembly - Mounting The Pwt Air/Water Heat Exchanger Cut-Out - Pfannenberg PWT 6402 230V Betriebsanleitung

Dachaufbau-luft-/ wasser-wärmetauscher
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
GB
3.4.1

General assembly requirements

NOTE
Danger to switch cabinet equipment from assembly chips
Assembly chips may penetrate into the switch cabinet when attaching the air/water heat exchanger cut-outs.
 Protect the switch cabinet from contamination during assembly and use protective covers.
Ensure that the following general requirements are met for safe and reliable operation of the air/water heat
exchangers:
• The installation location of the switch cabinet must be such that there is sufficient space for water and
condensate drainage of the air/water heat exchanger.
• Installations in the switch cabinet must not obstruct air circulation.
• Secure switch cabinet against tilting.
• Ensure that the existing roof can bear the additional weight of the air/water heat exchanger.
• The air/water heat exchanger can be installed with or without an external unit cover.
• Protect the installation site from heavy soiling using covers.
3.4.2
Assembly of the PWT air/water heat exchanger – mounting the cut-out
Item
Designation
1
Unit contour of the contact surface
Operating Manual PWT 6402 230V / 400V 086100107 © Pfannenberg GmbH
Figure 7 – PWT switch cabinet cut-out
Item
2
Designation
Area for water and condensate drainage
Page 12 / 30

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pwt 6402 400v

Inhaltsverzeichnis