Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance - Riello MB 412/2 Montage- Und Bedienungsanleitung

Zweistufige gasstrecken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 15
6

Maintenance

6.1
Notes on safety for the maintenance
The periodic maintenance is essential for the good operation,
safety, yield and duration of the gas train.
It allows you to reduce consumption and polluting emissions and
to keep the product in a reliable state over time.
The maintenance interventions and the calibration
must only be carried out by qualified, authorised
personnel, in accordance with the contents of this
DANGER
manual and in compliance with the standards and
regulations of current laws.
Before carrying out any maintenance, cleaning or checking oper-
ations:
6.2
Maintenance programme
6.2.1
Maintenance frequency
The gas combustion system should be checked at
least once a year by a representative of the man-
ufacturer or another specialised technician.
6.2.2
Checking and cleaning
The operator must use the required equipment
during maintenance.
6.2.3
Filter maintenance
Check the filter at least once a year!
The filter may be changed without dismantling the
structure.
WARNING
Where the filter is being replaced regularly it is ad-
visable to replace the fixing screws.
For maintenance operations, proceed as follows:
 Interrupt the gas flow by closing the gate.
 Unscrew the screws and remove the filter cover.
 Remove the filter and replace it with a new one.
 Replace the cover and retighten the screws (without force).
 Test the functionality and seal.
Maintenance
Disconnect the electrical power using the main
switch.
DANGER
Close the fuel interception tap.
DANGER
Wait for the components in contact with heat
sources to cool down completely.
11
GB
20049406

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Mb 415/2Mb 420/2Mb 405/2Mb 407/2Mb 410/2

Inhaltsverzeichnis