Herunterladen Inhalt Inhalt Diese Seite drucken

Riello MB 412/2 Montage- Und Bedienungsanleitung Seite 45

Zweistufige gasstrecken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 15
4.5
Gas train installation
Check that there are no gas leaks.
Pay attention when handling the train: danger of
crushing of limbs.
Explosion danger due to fuel leaks in the pres-
ence of a flammable source.
Precautions: avoid knocking, attrition, sparks and
heat.
Make sure that the fuel interception tap is closed
before performing any operation.
The operator must use the required equipment
during installation.
4.6
Electrical wiring
Notes on safety for the electrical wiring
 The electrical wiring must be carried out with the electrical supply disconnected.
 Electrical wiring must be carried out by qualified personnel and in compliance with the regulations currently in
force in the country of destination.
 The manufacturer declines all responsibility for modifications or connections different from those shown in the wir-
ing diagrams.
 Check that the electrical supply of the train corresponds to that shown on the identification label and in this man-
ual.
 The electrical safety of the device is obtained only when it is correctly connected to an efficient earthing system,
DANGER
made according to current standards. It is necessary to check this fundamental safety requirement. In the event of
doubt, have the electrical system checked by qualified personnel. Do not use the gas tubes as an earthing system
for electrical devices.
 Do not touch the device with wet or damp body parts and/or in bare feet.
 Do not pull the electric cables.
For the electrical wirings to the burner refer to the
instruction manual of said burner.
WARNING
Installation
The gas trains are intended to be installed to the left of the burner:
if fitted to the right, it is necessary to move the pressure test point
to the opposite side (Fig. 1, page 4).
It may be necessary to place an adapter between the gas train
and the burner if the diameters of the train are different from
those for which the burner is set up.
The connection between the gas feeding line and the train is cre-
ated using the flange 1), supplied with the system, by fastening it
to the unit with nuts 3).
It is best to tighten screws in a criss-cross pattern.
CAUTION
Do not, under any circumstances, install the valve
with the coil facing down.
DANGER
Once installation is complete, you must check for leaks and make
sure the gas train is working properly.
7
GB
20049406

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Mb 415/2Mb 420/2Mb 405/2Mb 407/2Mb 410/2

Inhaltsverzeichnis