Herunterladen Inhalt Inhalt Diese Seite drucken

Riello MB 412/2 Montage- Und Bedienungsanleitung Seite 46

Zweistufige gasstrecken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 15
4.6.1
Connections for burners with terminal board
The gas trains shown in Tab. D are prepared in the factory to be
connected in accordance with the electrical diagram shown in
Fig. 5.
Code
Model
3970152
MB 412/2 - RT 20
3970183
MB 415/2 - RT 20
3970184
MB 420/2 - RT 20
The gas train shown in Tab. E is prepared in the factory to be con-
nected in accordance with the electrical diagram shown in Fig. 6.
Code
Model
3970185
MB 420/2 CT RT 20
Key
PG
Min gas pressure switch
V
Valve group V1 - V2 - VS
VPS Valve leak detection control device
BN
Brown
BU
Blue
BK
Black
YE
Yellow
20049406
Installation
3
Tab. D
Tab. E
20050035
VPS
L1
N
B5
T6
T7
T8
20050037
8
GB
PG
2 1
1
2 3
PG
2
1
3 1
2 3
VS
V1
V2
V
Fig. 5
VS
V1
V2
V
Fig. 6

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Mb 415/2Mb 420/2Mb 405/2Mb 407/2Mb 410/2

Inhaltsverzeichnis