Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing For Assembling The Sauna Control; Assembling The Sauna Control - Sentiotec A2-15 Montage- Und Gebrauchsanweisung

Saunasteuerung
Vorschau ausblenden Andere Handbücher für A2-15:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembling Instructions for Specialist Staff Only
1
Preparing the Assembly of the
Sauna
Control 1
Mount the sauna control on the exterior of the sauna
cabin or in accordance with the recommendations of
the manufacturer.
A non-detachable supply connection provides the
electrical power supply.
CAUTION - Damages of Device:
The sauna control is protected from splashing water
(protection degree IP X4). Nevertheless the sauna
controls should not come in contact with water.
Mount the sauna control at a dry location. With envi-
ronmental conditions of 40° Celsius and a maximum
of 95 percent humidity.
1. Interlock 5 slightly push in and lift off the top of
the enclosure 6.
2. Recessed head screw 16 mm length for the
upper mounting hole 1 tighten up to a gap of 7
mm to the sauna wall (refer to detail) and hang
up bottom of enclosure 4 at the back side.
2

Assembling the Sauna Control

2 6
1. Guide the circuit lines of the temperature sensor
F I with overtemperature fuse through the moun-
ting opening 6 into the bottom of the enclosure 1
andin accordance with the circuit diagram clamp
to the terminal strip 3.
CAUTION- Damages of Device:
You are only allowed to use the sauna control for
controlling 3 heating circuits with a maximum heating
capacity of 5,0 kW per heating circuit.
The sensor lines have to run separately to other circuit
and control lines.
3. Guide the supply cable of the heating system
through the mounting opening 8 into the bot-
tom of the enclosure 1 and in accordance with
the circuit diagram (page 9) clamp to the termi-
nal strip 7/C.
4. Guide the power supply cable (as non-de-
tachable wiring) through the mounting opening
9 into the bottom of the enclosure 1 and in
accordance with the circuit diagram clamp to the
terminal strip 7/C.
5. Guide the lighting circuit lines through the moun-
ting opening into the bottom of the enclosure 1
and in accordance with the circuit diagram clamp
to the terminal strip 7/C.
6. Screw two recessed head screws, 20 mm in
length, into the bottom mounting holes.5 Check
for secure fit of the bottom of the enclosure 1.
19

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis